What the facilitation team takes from the workshop process, recorded so the next round does not start from zero.
The map did more work than the slide#
Working on the villages' own drawings produced more decisions than the technical presentation did.
Two villages need two processes#
Separate group work produced two honest results instead of one averaged one.
An open question is a result#
Recording that the final 15 per cent is undecided is more useful than inventing a purpose for it.
Cost first, share second#
The budgeting session only became concrete once operating and maintenance costs were written down.
A simulation finds what a review misses#
Testing the drafts against scenarios surfaced gaps reading had not.
Supporting documents & downloads
One page can carry several PDF attachments. Until the documentation team uploads them, this section says so instead of offering an empty download.
Supporting documents will be available after publication.
Sources & references
Workshop brief and three-day agenda supplied by the MARVEL – Wahana Visi Indonesia programme team (16–18 October 2026, Aston Inn Mataram).
Editorial status: Workshop discussion.