Workshop report portal · 16–18 October 2026 · Aston Inn Mataram
MARVELEcotourism Knowledge Hub
Expected Outcomes

Expected Outcomes

What should change after the workshop

Expected outcomeUpdated 31 Oct 2026

An expected outcome is a change in practice. None of the outcomes below has been measured; they describe what the workshop is designed to produce.

Expected outcomeWhat it looks like in practiceHow it would be measured
Stronger governanceEvery procedure has an owning unit and a decision routeInstitutional decision recorded; SOP status decided
Conservation awarenessOperators can explain the function of the area and why a zone is closedSpot check during monitoring visits
Safety attentionEvery departure follows the same checks and briefingChecklist records; incident and near-miss log
Financial transparencyMonthly statement posted for the communityStatements produced for consecutive months
SOP readinessProcedures applied without being looked upSimulation re-run; observed compliance
Joint decision-makingDecisions recorded in an agreed formatDecision records in the village file

Post-workshop assessment pending

A post-workshop assessment is required before any of these outcomes can be reported as achieved. The instrument is supplied by the programme team.

See the full results report →

Supporting documents & downloads

One page can carry several PDF attachments. Until the documentation team uploads them, this section says so instead of offering an empty download.

Supporting documents will be available after publication.

Sources & references

Workshop brief and three-day agenda supplied by the MARVEL – Wahana Visi Indonesia programme team (16–18 October 2026, Aston Inn Mataram).

Editorial status: Expected outcome.