Workshop report portal · 16–18 October 2026 · Aston Inn Mataram
MARVELEcotourism Knowledge Hub
Seruni Mumbul Ecotourism SOP

SOP-02 — Pengelolaan dan Pelayanan Pengunjung

Denda Seruni Mangrove Ecotourism · draft operating procedure

DraftProposed frameworkStandard operating procedure Seruni MumbulUpdated 31 Oct 2026

Visitor handling from first inquiry to post-visit feedback, including conduct rules.

This procedure covers covers inquiry, booking, arrival, registration, briefing, guided activity, feedback and complaint handling.

Draft framework

Draft framework. The SOP number, official title and final wording are set from the approved document once it is uploaded; nothing here is in force until the village adopts it.

The official document number, final wording and annexes are set from the source document once the village uploads it. Editing this page does not change the source PDF.

Document status Draft Denda Seruni Mangrove Ecotourism
SOP number
SOP-02
Category
Pengelolaan dan Pelayanan Pengunjung
Version
1.0
Last revised
18 October 2026
Responsible
Operations coordinator, Denda Seruni

This procedure is not in force. It becomes applicable only when the responsible parties approve it and the village adopts it.

A · Purpose & scope#

Purpose#

To give every visitor the same information, the same safety briefing and the same conduct rules, regardless of who receives them.

Scope#

Covers inquiry, booking, arrival, registration, briefing, guided activity, feedback and complaint handling.

B · Responsible personnel#

RoleResponsibility
Village authorityHolds the mandate, adopts the procedures, receives the periodic report
Operations coordinatorCoordinates the three gates and the daily assignment of staff
Gate officerRegistration, ticket, visitor count at each gate
Parking officerVehicle placement and capacity at each parking area
Guide coordinatorGuide roster and interpretation quality
Safety duty holderPre-departure checks and emergency response
Conservation unitZoning compliance and mangrove monitoring
Finance unitFee collection, recording, monthly statement
Stall and culinary groupStall operation and food hygiene

Accountable party: Operations coordinator, Denda Seruni

C · Operational process#

  1. 01 Visitor inquiry Start

    Route, capacity, price, rules

    PIC Reservation unit

  2. 02 Record the booking Document

    Booking form F-03

    PIC Reservation unit

  3. 03 Confirmation sent Process

    Conduct rules attached

    PIC Reservation unit

  4. 04 Registration at arrival Process

    Group counted

    PIC Gate officer

  5. 05 Safety briefing Warning

    Mandatory before activity

    PIC Guide

  6. 06 Guided activity and feedback End

    Feedback form F-04

    PIC Guide

Equipment & materials#

  • Booking form and daily sheet
  • Conduct rules leaflet
  • Registration book
  • Feedback form

D · Detailed procedure#

  1. Answer every inquiry with route, capacity, price and the conduct rules.
  2. Record the booking: date, group size, route, guide and fee.
  3. Send a written confirmation with the conduct rules attached.
  4. Register the group on arrival and confirm the group count.
  5. Deliver the safety and conduct briefing before the activity starts.
  6. Collect feedback at completion and record any complaint with an owner.

E · Operational checklist#

TaskPICFrequency
Booking recorded before confirmationReservation unitEvery booking
Conduct rules given to the visitorReservation unitEvery booking
Group registered and countedGate officer or guideEvery arrival
Briefing deliveredGuideBefore activity
Complaint recorded with an ownerReservation unitWhenever raised
FormCodeUsed by
Booking formF-03Reservation unit
Visitor feedback formF-04Guide

G · Monitoring & compliance#

IndicatorTargetChecked by
Bookings with a complete record100%Reservation unit
Briefings delivered before activity100% of departuresSafety duty holder
Complaints answered within 3 days100%Operations coordinator

Notes & review record#

Draft framework prepared from the workshop scope. Status stays Draft until the management body reviews it and the village adopts it.

Supporting documents & downloads

One page can carry several PDF attachments. Until the documentation team uploads them, this section says so instead of offering an empty download.

Supporting documents will be available after publication.

Sources & references

Phase 03 brief, workshop agenda (16–18 October 2026) and the village reference maps supplied by the MARVEL – Wahana Visi Indonesia team.

Editorial status: Proposed framework.