Workshop report portal · 16–18 October 2026 · Aston Inn Mataram
MARVELEcotourism Knowledge Hub
Sugian Ecotourism SOP

SOP-03 — Operasional Aktivitas Wisata

Sugian Mangrove Ecotourism · draft operating procedure

DraftProposed frameworkStandard operating procedure SugianUpdated 31 Oct 2026

How each visitor activity is prepared, run and closed, with the conditions that stop it.

This procedure covers applies to guided walks, canoeing, camping, culinary visits and community activities offered at the destination.

Draft framework

Draft framework. The SOP number, official title and final wording are set from the approved document once it is uploaded; nothing here is in force until the village adopts it.

The official document number, final wording and annexes are set from the source document once the village uploads it. Editing this page does not change the source PDF.

Document status Draft Sugian Mangrove Ecotourism
SOP number
SOP-03
Category
Operasional Aktivitas Wisata
Version
1.0
Last revised
18 October 2026
Responsible
Operations coordinator, Sugian

This procedure is not in force. It becomes applicable only when the responsible parties approve it and the village adopts it.

A · Purpose & scope#

Purpose#

To run every activity inside the agreed route and capacity, and to stop it when a condition makes it unsafe or non-compliant.

Scope#

Applies to guided walks, canoeing, camping, culinary visits and community activities offered at the destination.

B · Responsible personnel#

RoleResponsibility
Village authorityHolds the mandate, adopts the procedures, receives the periodic report
Operations coordinatorRuns the destination day to day; assigns guides and boats; answers for daily decisions
Reservation & administrationBookings, visitor records, monthly report
Guide coordinatorGuide roster, interpretation quality, briefing delivery
Safety duty holderPre-departure checks, emergency response, incident log
Conservation unitZoning compliance, monitoring, rehabilitation
Finance unitFee collection, recording, allocation and monthly statement
UMKM groupFood, drink and stall services under a village agreement

Accountable party: Operations coordinator, Sugian

C · Operational process#

  1. 01 Activity planned Start

    Capacity and route set

    PIC Operations coordinator

  2. 02 Equipment issued and counted Document

    Loan note F-06

    PIC Guide

  3. 03 Conditions acceptable? Decision

    Yes: proceed

    PIC Safety duty holder

  4. 04 No: stop and inform visitors Process
  5. 05 Activity conducted Process

    Agreed route only

    PIC Guide

  6. 06 Activity closed End

    Equipment returned and recorded

    PIC Guide

Equipment & materials#

  • Daily activity sheet
  • Route map
  • Life jackets and safety equipment
  • Equipment log

D · Detailed procedure#

  1. Check the activity plan, capacity and route condition before departure.
  2. Issue and count the equipment, and record the issue.
  3. Deliver the briefing and confirm the group count.
  4. Hold the agreed route for the whole activity.
  5. Stop the activity if weather, tide, equipment or group condition changes.
  6. Return, count the equipment and record any damage or loss.

E · Operational checklist#

TaskPICFrequency
Activity plan and capacity confirmedOperations coordinatorDaily
Equipment issued and countedGuidePer departure
Route condition checkedGuidePer departure
Activity closed and equipment returnedGuidePer departure
Damage or loss recordedGuideWhen it happens
FormCodeUsed by
Daily activity sheetF-05Operations coordinator
Equipment loan noteF-06Guide

G · Monitoring & compliance#

IndicatorTargetChecked by
Departures with a completed activity sheet100%Operations coordinator
Activities stopped when a condition fails100% of casesSafety duty holder
Equipment count reconciled daily100%Operations coordinator

Notes & review record#

Draft framework prepared from the workshop scope. Status stays Draft until the management body reviews it and the village adopts it.

Supporting documents & downloads

One page can carry several PDF attachments. Until the documentation team uploads them, this section says so instead of offering an empty download.

Supporting documents will be available after publication.

Sources & references

Phase 03 brief, workshop agenda (16–18 October 2026) and the village reference maps supplied by the MARVEL – Wahana Visi Indonesia team.

Editorial status: Proposed framework.