Workshop report portal · 16–18 October 2026 · Aston Inn Mataram
MARVELEcotourism Knowledge Hub
Seruni Mumbul Ecotourism SOP

SOP-08 — Keselamatan, Mitigasi, dan Tanggap Darurat

Denda Seruni Mangrove Ecotourism · draft operating procedure

DraftProposed frameworkStandard operating procedure Seruni MumbulUpdated 31 Oct 2026

Hazard control, pre-departure checks and the emergency response sequence.

This procedure covers applies to every activity on the water, on the boardwalk and at the gates, and to every staff member on duty.

Draft framework

Draft framework. The SOP number, official title and final wording are set from the approved document once it is uploaded; nothing here is in force until the village adopts it.

The official document number, final wording and annexes are set from the source document once the village uploads it. Editing this page does not change the source PDF.

Document status Draft Denda Seruni Mangrove Ecotourism
SOP number
SOP-08
Category
Keselamatan, Mitigasi, dan Tanggap Darurat
Version
1.0
Last revised
18 October 2026
Responsible
Operations coordinator, Denda Seruni

This procedure is not in force. It becomes applicable only when the responsible parties approve it and the village adopts it.

A · Purpose & scope#

Purpose#

To prevent an incident where possible and to respond in the same sequence every time when one happens.

Scope#

Applies to every activity on the water, on the boardwalk and at the gates, and to every staff member on duty.

B · Responsible personnel#

RoleResponsibility
Village authorityHolds the mandate, adopts the procedures, receives the periodic report
Operations coordinatorCoordinates the three gates and the daily assignment of staff
Gate officerRegistration, ticket, visitor count at each gate
Parking officerVehicle placement and capacity at each parking area
Guide coordinatorGuide roster and interpretation quality
Safety duty holderPre-departure checks and emergency response
Conservation unitZoning compliance and mangrove monitoring
Finance unitFee collection, recording, monthly statement
Stall and culinary groupStall operation and food hygiene

Accountable party: Operations coordinator, Denda Seruni

C · Operational process#

  1. 01 Day opened Start

    Conditions checked

    PIC Safety duty holder

  2. 02 Conditions acceptable? Decision

    Yes: operate

    PIC Safety duty holder

  3. 03 No: close the water activity Process
  4. 04 Pre-departure checks Document

    F-15 completed

    PIC Guide

  5. 05 Activity runs Process

    Briefing delivered

    PIC Guide

  6. 06 Incident? Decision

    Yes: emergency sequence

    PIC Any staff

  7. 07 No: normal close Process
  8. 08 Emergency sequence Warning

    Secure, call, aid, evacuate, report

    PIC Safety duty holder

  9. 09 Report and review End

    F-16 and revision

    PIC Operations coordinator

Equipment & materials#

  • Life jackets (fitted and counted)
  • First aid kit
  • Communication device
  • Incident form
  • Emergency contact list

D · Detailed procedure#

  1. Check weather, tide and route condition before opening.
  2. Fit and count life jackets for every person before departure.
  3. Deliver the safety briefing with a demonstration, not an announcement.
  4. Designate the safety duty holder for the day and record it.
  5. On an incident: stop the activity, secure the group, call for help, act only within competence.
  6. Record every incident and near miss and review the procedure after it.

E · Operational checklist#

TaskPICFrequency
Weather, tide and route checkedSafety duty holderBefore opening
Life jackets fitted and countedGuideEvery departure
Safety briefing delivered with demonstrationGuideEvery departure
Communication device testedSafety duty holderDaily
Incident and near-miss log completedSafety duty holderDaily
FormCodeUsed by
Pre-departure safety checklistF-15Safety duty holder
Incident and near-miss formF-16Safety duty holder

G · Monitoring & compliance#

IndicatorTargetChecked by
Departures with a completed safety checklist100%Safety duty holder
Incidents recorded within 24 hours100%Operations coordinator
Drills held with the technical agencyAt least once a yearVillage authority

Notes & review record#

Draft framework prepared from the workshop scope. Status stays Draft until the management body reviews it and the village adopts it.

Supporting documents & downloads

One page can carry several PDF attachments. Until the documentation team uploads them, this section says so instead of offering an empty download.

Supporting documents will be available after publication.

Sources & references

Phase 03 brief, workshop agenda (16–18 October 2026) and the village reference maps supplied by the MARVEL – Wahana Visi Indonesia team.

Editorial status: Proposed framework.