Seruni Mumbul Ecotourism SOP

SOP-09 — Pengelolaan Sampah dan Kebersihan Kawasan

Denda Seruni Mangrove Ecotourism · draft operating procedure

DraftProposed frameworkStandard operating procedure Seruni MumbulUpdated 31 Oct 2026

Waste collection, separation, transfer and the cleanliness standard of the area.

This procedure covers covers the gates, parking areas, activity areas, boardwalk, jetty, stalls and the mangrove edge.

Draft framework

Draft framework. The SOP number, official title and final wording are set from the approved document once it is uploaded; nothing here is in force until the village adopts it.

The official document number, final wording and annexes are set from the source document once the village uploads it. Editing this page does not change the source PDF.

Document status Draft Denda Seruni Mangrove Ecotourism
SOP number
SOP-09
Category
Pengelolaan Sampah dan Kebersihan Kawasan
Version
1.0
Last revised
18 October 2026
Responsible
Operations coordinator, Denda Seruni

This procedure is not in force. It becomes applicable only when the responsible parties approve it and the village adopts it.

A · Purpose & scope#

Purpose#

To keep the mangrove area and the visitor facilities clean, and to stop waste entering the water.

Scope#

Covers the gates, parking areas, activity areas, boardwalk, jetty, stalls and the mangrove edge.

B · Responsible personnel#

RoleResponsibility
Village authorityHolds the mandate, adopts the procedures, receives the periodic report
Operations coordinatorCoordinates the three gates and the daily assignment of staff
Gate officerRegistration, ticket, visitor count at each gate
Parking officerVehicle placement and capacity at each parking area
Guide coordinatorGuide roster and interpretation quality
Safety duty holderPre-departure checks and emergency response
Conservation unitZoning compliance and mangrove monitoring
Finance unitFee collection, recording, monthly statement
Stall and culinary groupStall operation and food hygiene

Accountable party: Operations coordinator, Denda Seruni

C · Operational process#

  1. 01 Bins and tools ready Start

    Separated bins at each point

    PIC Cleaning team

  2. 02 Clean-up round Process

    Before opening

    PIC Cleaning team

  3. 03 Waste separated? Decision

    Yes: to the collection point

    PIC Cleaning team

  4. 04 No: sort before storage Process
  5. 05 Transfer to the village service Process

    Agreed schedule

    PIC Cleaning team

  6. 06 Log completed End

    F-18

    PIC Operations coordinator

Equipment & materials#

  • Waste bins (separated)
  • Collection point
  • Cleaning tools
  • Waste log

D · Detailed procedure#

  1. Place separated bins at every gate, parking area and activity point.
  2. Run a clean-up round before opening and after closing.
  3. Separate organic and plastic waste at the collection point.
  4. Transfer waste to the village service on the agreed schedule.
  5. Record the daily waste volume and any problem with the schedule.
  6. Report dumping in the mangrove area as an incident.

E · Operational checklist#

TaskPICFrequency
Bins in place and separatedCleaning teamDaily
Clean-up round before openingCleaning teamDaily
Waste separated at the collection pointCleaning teamDaily
Transfer to the village serviceCleaning teamPer schedule
Waste log completedOperations coordinatorWeekly
FormCodeUsed by
Daily cleaning checklistF-17Cleaning team
Waste logF-18Operations coordinator

G · Monitoring & compliance#

IndicatorTargetChecked by
Days opened with the clean-up round completed100%Operations coordinator
Waste transferred on schedule100%Cleaning team
Waste found in the mangrove areazero incidentsConservation unit

Notes & review record#

Draft framework prepared from the workshop scope. Status stays Draft until the management body reviews it and the village adopts it.

Supporting documents & downloads

One page can carry several PDF attachments. Until the documentation team uploads them, this section says so instead of offering an empty download.

Supporting documents will be available after publication.

Sources & references

Phase 03 brief, workshop agenda (16–18 October 2026) and the village reference maps supplied by the MARVEL – Wahana Visi Indonesia team.

Editorial status: Proposed framework.